ChevelleForum.net

Go Back   Chevrolet Chevelle Forums > Chevrolet Chevelle Garage > Chevelle Engine & Trans
Register FAQ Chevelle Chat Room Community Calendar

Reply
 
Thread Tools Display Modes
  #1  
Old 04-26-2013, 08:22 PM
Notabad1967 Notabad1967 is offline
Junior Member
 
Join Date: Apr 2013
Posts: 1
Default 4 speed conversion sm block

Info on the Z-bar installation tips for clean floor cut basically things a 60's mechanic twice removed needs to know......
Reply With Quote
  #2  
Old 04-27-2013, 06:24 AM
Hank70SS's Avatar
Hank70SS Hank70SS is offline
Moderator
 
Join Date: Dec 2009
Location: Brighton, MI
Posts: 4,719
Default

The z-bar mounts on a ball end stud screwed into the engine block. On a 70 the other end mounts to a bracket bolted to frame rail, 67 should be similar. Then you have to mount the clutch pedal assembly. If you get the rubber boot and metal flange that goes around the shifter that will show what size hole to cut in the tunnel. I have a 70 so can't give you any measurements on where to place it, maybe someone else can.
__________________
Hank

70 Chevelle SS396(454), M20, 3.73
My Chevelle
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 01:28 PM.



Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Audiokarma.org