My plan is to be there until the 4th. That is if all goes according to the way I have shit scheduled. Were going to build all the ceilings and interior walls. The tray ceilings will take a little more time that I was thinking, according to Doug. I have to stack out the plumbing, run all the water lines, install the whirlpool tub, install two showers and get the bathroom in the garage hooked up and working. I'm also going to make a separate water distribution system for hard water. Silcocks in both buildings, washing water in the garage, and irrigation system will be on water.I have 3 different inspections that have to pass. They do a very complete job of inspecting everything.
|