Very nice ,
|
Looking real nice.
|
Project has really been moving ahead. Still doing all the work myself with the help of my son, when he can come down to help hang rock. Almost ready for cabinets.
http://chevelleforum.org/picture.php...pictureid=4874 http://chevelleforum.org/picture.php...pictureid=4872 http://chevelleforum.org/picture.php...pictureid=4871 |
Looks like you've been busy Ray. Looking good, now you're down to the detail work, cabinets, trim and a little paint. Good job.
|
Looks real good from here! I like the receptacle in the end of the knee wall. Smart move. Makes it at least twice as hard when you work by yourself, doesn't it?
|
Really taking shape now. Installed the shower doors so I will be able to take a shower now. I ordered the glass 80" tall so I don't have to duck to get into the shower. Just have one room left down stairs to sheet rock. Then I can texture the ceilings and start the install of the cabinets for the kitchen.
http://chevelleforum.org/picture.php...pictureid=4876 http://chevelleforum.org/picture.php...pictureid=4877 http://chevelleforum.org/picture.php...pictureid=4878 Got a little dusty http://chevelleforum.org/picture.php...pictureid=4875 |
Aaaah! I hate drywall dust. Nice work, you've come a long ways since you started. looks like a totally different place.
|
Looking good Ray ,I think you need to try out the shower .
|
This last weekend was texture ceiling day, did a California knock down on it. All of the lower part of the house is now sheet rocked and repairs to my garage wall are almost done. House is really starting to come together. I have all the flooring on site and the kitchen cabinets are finally ordered.
Before http://chevelleforum.org/picture.php...pictureid=4902 after http://chevelleforum.org/picture.php...pictureid=4903 Had to put plastic on all the walls and floor. http://chevelleforum.org/picture.php...pictureid=4904 finished ceilings http://chevelleforum.org/picture.php...pictureid=4906 http://chevelleforum.org/picture.php...pictureid=4907 http://chevelleforum.org/picture.php...pictureid=4905 |
Looking goo there Ray.
|
That place is really looking great Ray! Nice to put a face with a name too!
|
Happy wife. Happy life
|
Quote:
|
Wife has picked her color, light grey
http://chevelleforum.org/picture.php...pictureid=4914 http://chevelleforum.org/picture.php...pictureid=4918 The last piece is the stairwell. http://chevelleforum.org/picture.php...pictureid=4916Built a temporary floor, so no ladder work over the stairs. http://chevelleforum.org/picture.php...pictureid=4917 Maybe by July we are done. I need to get back to working on cars. Lol |
Wife and I had a little bonding time this weekend. Lol. Got the kitchen cabinets, came in 116 boxes. Little assembly required. Might actually have this finished by end of summer.
http://chevelleforum.org/picture.php...pictureid=4927 http://chevelleforum.org/picture.php...pictureid=4923 http://chevelleforum.org/picture.php...pictureid=4924 http://chevelleforum.org/picture.php...pictureid=4925 http://chevelleforum.org/picture.php...pictureid=4926 |
It is getting there.
|
You have come a long way with this job Ray. Looks very nice.
|
Almost ready for counter tops.
http://chevelleforum.org/picture.php...pictureid=4938 http://chevelleforum.org/picture.php...pictureid=4939 The last room to finish the taping on. Just an extra area for sleeping up stairs. I raised the ceiling by a foot so you can walk down the center without ducking. http://chevelleforum.org/picture.php...pictureid=4940 http://chevelleforum.org/picture.php...pictureid=4941 |
Looking great .
|
Moving right along Ray. Place is really coming together.
|
Been working on it, but been having power issues. House is completely rewired with new breaker panel. Turns out the meter base has conveniently gone bad after the power company put in a new smart meter in. Looks like a set back at this point. Only have one leg working in the house, so no 220 volts. Not sure what this is going to cost to replace. My base is built into the wall of the house.
|
Open the meter box and see if you have 2 hot legs coming into meter and 2 coming out. Don't worry about breaking the seal, workers open them all the time when they need 220 power when working outside.
The power here sucks. We have a whole house standby gen, so do the people behind us, 2 across the side street. Next store and across the street have portable gens. We lose 1 leg a lot, may only be for a few seconds but enough to mess things up. I have a battery backup on the DVR and TV, one on the modem and one on the desktop PC. That's a lot of crap because they can't give us decent power. |
Meter base has been replaced. now onto the final touches on the house.
|
Guess it's time to get serious about doing the finish work on this house. Been busy the last 3 weeks and wife is finally going to get the counter tops figured out and a kitchen sink. (one would think this would have been done already, Lol) . Up stairs just need the floor repaired and trim put on. Thinking about doing a painted simulated wood floor for now up there. I hate doing patch work, I think its more work then if I had just started over at times.
http://chevelleforum.org/picture.php...pictureid=4963 http://chevelleforum.org/picture.php...pictureid=4964 http://chevelleforum.org/picture.php...pictureid=4965 |
Nice work Ray, looks really good. You're going to have a brand new place when you get done.
|
Well the project continues to move forward. Ready to start the leveling process on the floors this New years weekend and once the gold platted sink arrives (Kidding, just not cheap) the counter tops can be measured cut and be installed. Just trim work to complete. Should finally be done by spring. Yah, I ready to be done. Look at the difference. I put this stair case in 3 times to satisfy the wife.
http://chevelleforum.org/picture.php...pictureid=4838 http://chevelleforum.org/picture.php...pictureid=4967 http://chevelleforum.org/picture.php...pictureid=4966 My buddy on the weekends. http://chevelleforum.org/picture.php...pictureid=4968 |
Looks great Ray .
|
You do nice work Ray. That's an awful big project you took on.
|
Spent my Birthday weekend again working on the wife's project. Leveling floors, way more work then I thought. I'm getting to old for this, lol.
http://chevelleforum.org/picture.php...pictureid=4974 http://chevelleforum.org/picture.php...pictureid=4975 http://chevelleforum.org/picture.php...pictureid=4976 Some of the final flooring going in. http://chevelleforum.org/picture.php...pictureid=4977 |
Looking good Ray. I know what you mean getting to old for this LOL.
|
Looks good. Your floor is very similar looking to the floor I put in our family room.
|
Finally got the floor to feel and look correct. I took this floor up 5 times to relevel and to get it to lock together correctly. Seems like a seam wanted to come apart on this floating floor. it was a long weekend being on my knees. Still sore. lol
http://chevelleforum.org/picture.php...pictureid=4978 Started on the fire place area. Have a mantle to install and a TV. http://chevelleforum.org/picture.php...pictureid=4979 and finally set the kitchen sink so the counter top people can measure for the counters. Sink only weighs 160 lbs. Dishwasher and Fridge are all hooked up. All the hardware put on the cabinets. Just the stove to go. http://chevelleforum.org/picture.php...pictureid=4980 |
Looks good Ray.
|
Lately its been every weekend at this project. All inspections are done except plumbing. One room at a time and now the kitchen is fully operational after 5 years.
http://chevelleforum.org/picture.php...pictureid=4981 http://chevelleforum.org/picture.php...pictureid=4982 Still lots to do, maybe by summer will be done. |
Looks great Ray .
|
Setting the bar high for trimming the doors and windows. Keeping with the style of the house which is craftman. The top header takes four different power tools to build. Also got on all the back splash in the kitchen installed
http://www.chevelleforum.org/picture...pictureid=4993 |
Looks beautiful.
|
Finally working on the finishing side. Got all my permits closed out except for the final inspection which I hope to do by the end of the month.
Trim going in in the living room http://chevelleforum.org/picture.php...pictureid=5007 Building the tops for the doors and windows http://chevelleforum.org/picture.php...pictureid=5008 Living room http://chevelleforum.org/picture.php...pictureid=5009 Wife's Kitchen http://chevelleforum.org/picture.php...pictureid=5010 |
I probably said it already but you do nice work Ray. Place looks amazing.
|
Beautiful place Ray , well worth all the years of work .
|
| All times are GMT -5. The time now is 12:27 PM. |