Slowing moving ahead
Continue to work on the dash. Got most of the modification done that I needed to get the heater controls and the dash plate all looking correct. Wating for my gauges to get back from being checked out and calibrated. Also been waiting for the new clock before I put them in. Still need to paint the center small circles black like the original had. Still trying to figure out how to make the glove box fit better. Thinking about making a jig to bend the glove box door so it will match the new dash bezel. I have a old door to play with. Wish me luck it will work.
__________________
Ray
1970 SS Chevelle Van Nuys Built
Last edited by shadowgray396; 09-26-2010 at 09:39 AM.
|