View Single Post
  #20  
Old 01-11-2014, 07:56 PM
FlintTony FlintTony is offline
Senior Member
 
Join Date: Dec 2009
Posts: 1,641
Default

Another long day. Put in 6" wooden fence posts most of the day. Me and post-hole diggers don''t get along too good. They always want to hurt me. Today the won.

Concrete guys were at the job all day. They have all the footings dug and most of the floor space smoothed and leveled. If everything goes as planned, concrete will be done this coming weekend.

I may have to temperorarly remove about 50" of the 4" pipe from the garage to the septic, so the excavator can get back in there. I hope not.
Reply With Quote