Thread: Wife's Project
View Single Post
  #57  
Old 08-29-2015, 09:27 PM
shadowgray396's Avatar
shadowgray396 shadowgray396 is offline
Senior Member
 
Join Date: Dec 2009
Location: Oregon City, Oregon
Posts: 6,062
Default

Down putting new sub floor in the bedroom. Building two pony walls to hold the upstairs floor joists so I can drop a bearing wall next weekend when I put up a 260 lb steel beam in. After that finish leveling the floors in the kitchen and living room and rip out the old floor and put in the new sub floor. Onto finishing the wiring for the rest of the house and insulate before winter gets here. Not sure what to do in my spare time.

First time I've seen the house at night. Just got all the lights working

__________________
Ray
1970 SS Chevelle Van Nuys Built

Last edited by shadowgray396; 09-07-2015 at 11:39 AM.
Reply With Quote