Thread: Wife's Project
View Single Post
  #11  
Old 09-07-2015, 01:24 AM
shadowgray396's Avatar
shadowgray396 shadowgray396 is offline
Senior Member
 
Join Date: Dec 2009
Location: Oregon City, Oregon
Posts: 6,062
Default

Loaded up the trailer at 5:30 am Saturday morning and headed for the coast to install a 260lb beam. Also a material lift on board to save the back.


Took about 6 hours to get it in place with the help from my son and a friend. Glad we had a material lift to help hold it in place to line up all the floor joist hangers.


Wife using a table to see how big of an island she wants now that the bearing wall is gone. Still have more floor to tear up and finish leveling the floors.
__________________
Ray
1970 SS Chevelle Van Nuys Built

Last edited by shadowgray396; 01-11-2016 at 02:35 PM.
Reply With Quote