Loaded up the trailer at 5:30 am Saturday morning and headed for the coast to install a 260lb beam. Also a material lift on board to save the back.
Took about 6 hours to get it in place with the help from my son and a friend. Glad we had a material lift to help hold it in place to line up all the floor joist hangers.
Wife using a table to see how big of an island she wants now that the bearing wall is gone. Still have more floor to tear up and finish leveling the floors.