Frame off project continues. Took out all the 1947 floors and now down to the original sub floor. Now its time to level and build the floor over the concrete floor over to the front door. Looks different now that all the inside walls are down and opened up. French doors are in, can now heat a room to sleep in. Gas line gets installed in about 2 weeks. Hot shower will be nice.
Wife cleaning the floor

Looking toward the kitchen and laundry room, with the wall now gone.

Front room area, need to extend the floors toward the front door. Old wood floor is where the house used to end.