![]() |
|
#1
|
||||
|
||||
|
Did have much work last week so I set up a 3 new trucks for some of the other guys, but my new truck arrived on friday so I spent the weekend installing a utility box to the carry all my survey gear. I made a new design and it took me about 16 hours to lay it out build it and transfer all my gear. The old design (1st picture) only took about 6 hours to build, so I'm not sure I will build another that takes that much work. Since this is my truck I went all out.
__________________
Ray 1970 SS Chevelle Van Nuys Built Last edited by shadowgray396; 07-30-2012 at 12:37 AM. |
|
|