ChevelleForum.net

Go Back   Chevrolet Chevelle Forums > The Backyard meeting spot > Off Topic
Register FAQ Chevelle Chat Room Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #18  
Old 10-22-2013, 06:05 PM
FlintTony FlintTony is offline
Senior Member
 
Join Date: Dec 2009
Posts: 1,641
Default

After a week of dealing with some of the most incompetent people I have ever dealt with, I have an Engineered drawing for the County. 1500 bucks for the Engineer to do some calculating and draw a picture. What a rip. I have to put up a 2' high berm, about 600' in length and dig a small pond the total length, about20' wide. There has to be silt filter material all along the banks, 3' in height. After e-mailing and talking on the phone to the the goons at the EPA, i am now 100% sure that they hire the most ignorant people they can find.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:03 PM.



Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Audiokarma.org