![]() |
|
#11
|
||||
|
||||
|
Loaded up the trailer at 5:30 am Saturday morning and headed for the coast to install a 260lb beam. Also a material lift on board to save the back.
Took about 6 hours to get it in place with the help from my son and a friend. Glad we had a material lift to help hold it in place to line up all the floor joist hangers. Wife using a table to see how big of an island she wants now that the bearing wall is gone. Still have more floor to tear up and finish leveling the floors.
__________________
Ray 1970 SS Chevelle Van Nuys Built Last edited by shadowgray396; 01-11-2016 at 02:35 PM. |
| Thread Tools | |
| Display Modes | |
|
|