ChevelleForum.net

Go Back   Chevrolet Chevelle Forums > Chevrolet Chevelle Car Talk > Chevelle General Talk

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-15-2016, 08:08 PM
paulywood paulywood is offline
Senior Member
 
Join Date: Sep 2014
Location: Mid-Michigan
Posts: 127
Default

Driveshaft and kick down cable are installed. Replaced the ignition and hooked that up. Rear brakes are done. Tried to gravity bleed the brakes and I didn't get any fluid to the rear. The brakes didn't work when I got it so I replaced a lot of parts but not the proportioning valve. Broke the line going to the rear and there was no fluid. So I got a new valve and removed the old one. Broke 2 lines taking the old one out but they are short front ones so I'll replace those tomorrow. Carb's all hooked up. Figured out I need new hoses for the power steering pump so my dream of starting it this weekend is on hold. Still have some wiring to finish up for the dash anyway. Rims came in so I'm picking them up tomorrow. Getting close!
__________________
1972 Chevelle Malibu Convertible Project
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:21 AM.



Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2026, Jelsoft Enterprises Ltd.
Audiokarma.org